Production Guide Menu
Revised Production Schedule
- Update in the Producer’s Portal Schedule tab, as per direction of the EP/PE
- Enter Rough Cut, Fine Cut, and Master Dates in Schedule. Upload full document as directed by EP/PE.
- Contact Production_Ops@discovery.com for any assistance.